FOSFATOS BAYOVAR PDF

Phone, Suggest a phone number Fosfatos Bayovar – Piura. Work Project. Unofficial Page. Fosfatos Bayovar – Piura. Posts about Fosfatos Bayovar – Piura. Fosfatos del Pacífico S.A. is a public Company listed in the Lima Stock Exchange non-metallic mining activities in Bayovar 9, in which, up to date, significant. FOSFATOS DE BAYÓVAR. No description Transcript of FOSFATOS DE BAYÓVAR. OBJETIVOS FOSFATOS DE BAYÓVAR. Full transcript.

Author: Kegar Votaur
Country: Pacific Islands
Language: English (Spanish)
Genre: Sex
Published (Last): 1 June 2012
Pages: 399
PDF File Size: 5.41 Mb
ePub File Size: 16.75 Mb
ISBN: 568-3-37509-749-9
Downloads: 91064
Price: Free* [*Free Regsitration Required]
Uploader: Kibar

Mining roof dilution gain. You should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to foxfatos economic and legal feasibility.

The geological data compilation, interpretation, geological modelling and Mineral Resource estimation methods and procedures are described in the following sections. Summary of Annual Salaries for Salaried Staff.

The deposits typically cover significant areal extents, often extending for tens or hundreds of kilometres in their maximum lateral dimensions. Focus has intercepted 16 distinct and correlatable phosphorite beds identified as PH01 through PH16 across the concession.

Fosfatos del Pacifio

A summary of the historical climate data for the project area, sourced from the Sechura, Peru weather station data as compiled on the www.

Mine Plan at end of Year Presented below in Table is the life of mine production for both products. Ten-year straight line method for depreciation has be used for both initial and sustaining capital. The mineral resources stayed the same but a new mine plan was developed to shorten waste rock hauls while making the 13 phosphate beds more accessible.

The boundary node coordinates for the Bayovar 12 Concession are presented in Figure Pit Buffer from Bayovar Road. The supervision and administration function encompasses the cost of salaried supervisory and administrative personnel stationed at the mine and pickup truck fleet operations and maintenance.

  3COM 8760 MANUAL PDF

The sensitivity analysis shown in Table compares the project discounted cash flow, IRR, and payback period against the base case when the commodity prices, initial capital and operating cost are varied. Qualified Person Statement on Data Verification.

Comprises massive beds of diatomite with minor pellets but no distinct or correlatable phosphorite beds; P 2 O 5 grade ranges from 1.

Table below shows the process scheme to which rosfatos phosphate capa has been assigned. Environment, Permits, and Social and Community Impacts.

Concessions can be granted for either metallic or non-metallic minerals and allow both exploration and exploitation. Preservation of the unit varies across the area due to variable and locally significant erosion by the overlying Clam Bore Sandstone.

Zapallal Formation Detailed Stratigraphy. Primary and Secondary Analytical Laboratories. The Bayovar 12 project area is accessible year round via a series of multi-lane sealed roads and highways Figure Mining activity on the Bayovar 12 Concession property is limited to small scale surface mining of quaternary age gypsum that occurs at surface on the low ground immediately east of the Tablazo.

Accordingly, information concerning mineral deposits set forth in this report may not be comparable with information made public by companies that report in accordance with U. Seabridge traces new sulphide-bearing intrusion at Iskut. Attrition Scrubbing and Desliming.

Focus looks to build on Bayovar PFS

Conditions favourable for the depositional and biochemical process are found in areas of warm paleoclimate or current climate for modern day equivalentstypically occurring between the 40th parallels at the time of deposition. Total phosphate concentrate product tonnes after beneficiation are estimated to be Piura is serviced by a modern domestic fosfatod with commercial daily service to Lima and other airports in the region.

  JEREMY SCAHILL BLACKWATER PDF

The capital cost estimates reported in this section address the construction of a phosphate beneficiation plant capable of producing one million tonnes of DAPR concentrate dry basis from two process lines at full production. The grade grid model comprises gridded surfaces for each modeled grade parameter for each individual phosphate and diatomite bed; the grade model grid surfaces are spatially associated with the corresponding stratigraphic model grid surfaces.

Maximum P 2 O 5 wt. While the region is classified ffosfatos a desert and there is limited year-round surface water present, the area is subject to tsunami and flooding associated with weather and seismic events occurring along the nearby pacific coast.

FOSFATOS DE BAYÓVAR by lency Cherre on Prezi

Phosphorite bed specific wet and dry relative densities used for tonnage calculations. The proposed plan for the Bayovar 12 mine is to haul concentrate to the Port of Bayovar along the Bayovar-Chiclayo Highway over a distance of approximately 43 km to the port facility owned by JPQ shareholders using contractor-owned, tonne end-dumping trailers.

The phosphorite beds are comprised primarily of massively bedded phosphate pellets with lesser grains and fragments of diatoms, volcanic glass; evaporate salts; quartz; feldspar; sponge fragments; gypsum, mica flakes and organic matter.

Bayovar 12 Plant Flowsheet. The second process line commenced at full productionmtpa in Year 3.

The following section summarizes the deposit type and genetic model as presented by Simandl fksfatos al. Drill Hole Location Methodology. The plant operating availability is 85 percent based on operating hours per year.

Net Income after Tax. TSF Capex by Stage.