ATMOS C20S NVOD PDF

CH C C20 C C CH CH CHA ALPHA CHE .. General Plant/Equipment Reactors – Alloy Atmos Press Bottlers Generator Skôr ako uvediete spotrebi do prevádzky Preítajte si, prosím, pozorne návod na.

Author: Nikokinos Medal
Country: Kazakhstan
Language: English (Spanish)
Genre: Career
Published (Last): 22 March 2005
Pages: 100
PDF File Size: 15.25 Mb
ePub File Size: 2.57 Mb
ISBN: 332-9-25612-526-4
Downloads: 46873
Price: Free* [*Free Regsitration Required]
Uploader: Mern

Inlets 1 and 3 always remain open. Leave long pieces of wood which have not fully combusted in the hopper for the next time the boiler is used. Installation may only be carried c20a by persons trained by the manufacturer. Should the waste gas temperature fall below the preset value, the thermostat switches the extraction ventilator off.

Opravu provedl, datum Oprava: It is because the boiler has certain momentum. Do not leave parts replacement for the last moment; prepare your boiler for the heating season as early as in spring. As you are pulling it out, individual segments of the grating start falling off. This company shall tamos complete the boiler installation report p.

It is prohibited to leave unattended children in the vicinity of operating boilers. Cover their complete surface ngod front faces so that no cinder may fall behind them.

The boiler is set to optimal operating parameters by the manufacturer. Choice and connection method of aymos and heating elements GB Boilers are provided to the user with the basic boiler performance control elements compliant with requirements for convenient heating and its safety.

In cases of personal wells, the boiler can be additionally protected by using a back-up power supply battery with an exchanger for operation back up of at nvid one pump.

  HENOCHISCHE MAGIE PDF

A control panel for electromechanical regulation is situated in the upper part of the boiler. Laddomat 21 GB With its construction, Laddomat 21 replaces the traditional connection composed of individual parts. Due to their huge feeding hoppers, the boilers save the user a lot of laborious wood treating and splitting operations. The atmod slow-burn combustion time c2s on the amount of fuel placed in the boiler and on the actual quantity of consumed heat.

Do not decrease the gap. Both the pumps may however be switched by just one thermostat. B ze dne There is also an irreversible safety thermostat on the panel.

When installing the boiler, position the rear section temporarily 10 mm higher prop it up in order to facilitate washout and air-bleeding. Heating system maintenance – including boilers Inspect at least once c2s0 2 weeks.

Návod k obsluze – Spotřebiče

If the installation was not carried out in a professional manner, the subsequent costs are borne by the company that carried out the installation. After a certain time, the sealing cord gets pressed down and therefore it becomes necessary to screw the wheel further into the boiler. Boiler corrosion protection This 2c0s means fuel savings and environmentally friendly operation.

It is used ztmos boilers over 32 kW. Instruction manual – GB Finish the installation by replacing the covers. Ignition valve pulling-rod 7.

Wood and coal boilers must be operated in compliance with the instructions stipulated in this manual so that satisfactory and safe functioning is achieved. In order nbod prevent excessive smoke formation, load new batch of fuel only after the previous fuel has combusted to at least one third of the loading volume.

  A CARTA DA FELICIDADE DE EPICURO PDF

The user is obliged to adhere to instructions from the operation and maintenance manual. After the last segment has been attached and the tube has been seated into the rear of the boiler, check that the atmoe has a side play of 5 — 7 mm. Its primary air regulation is however in the usual place, which atjos the same for all boiler types.

Basic wood burning data You can ensure maximum output and a long service life if you burn wood which has been left for at least 2 years to dry. Seal the grating tube with two sealing cords and lock it by a screw with a washer. Wood and coal may be burnt separately or together.

Door sealing cord replacement Procedure: Otherwise, the ventilator S may sustain damage. The purchaser was familiarised with the use and operation of the product — in a provable way.

Návod k obsluze

The valve minimum gap is set by a setscrew to 3 — 8 mm; boiler service-life prolonging feature. This is the only procedure that can ensure good door seal! Prepare the boiler for slow-burning nvov in the following way: The ducts for secondary air inlet must always face downwards.

The guarantee period is extended by the period of time for which has the product been under repair. Slide the grating tube back in x20s and place the individual segments back on it, one by one.

The following graph illustrates the relationship of moisture content to heating capacity of the fuel.