ALCATEL BTS INSTALLATION AND COMMISSIONING PDF

BTS ON-Line commissioning Procedure using B10 Go to configuration>> Hardware setting>>Begin HW modification. Edit Sector Mapping and. Alcatel Bts Installation And Commissioning Pdf. BTS OFF-Line commissioning. Procedure OF ALCATEL BTS using B Prepared By: Umair. Installation & Commissioning – BTS, Microwave I&C of all Types of BTS-2G ( NSN, Ericsson, Huawei, ZTE, Alcatel-Lucent etc) in all possible installation types .

Author: Dirg Talar
Country: Belgium
Language: English (Spanish)
Genre: Love
Published (Last): 3 December 2006
Pages: 297
PDF File Size: 7.50 Mb
ePub File Size: 10.95 Mb
ISBN: 134-7-70860-632-8
Downloads: 21958
Price: Free* [*Free Regsitration Required]
Uploader: Kagadal

See Figure 27 2. It’s worth a thousand words. BTS SW download in progress If it has not, the test must be carried out at the end of commissioning procedure.

Approximate 0V voltage value means power OK. Ask a Question Usually answered in minutes! If output 48 V supply alcxtel installed, check the voltage polarity between each 48 V capacitor and 0 V capacitor.

Check with the multimeter the voltage between each line L and neutral N. Switch off the service lights outdoor version.

Click [ Submit ].

Alcatel BSS A BTS / A MBS GSM Commissioning Manual | Ramamurthy K –

Click [ Upload ] 4. Check the declaration of battery type and number of branches by pressing Number of Battery Units the Status button on BCU1 until the battery information is displayed ex. Check with the multimeter that the 0V and V voltages are on the right terminals See Figure 28 aand. Check that the power modules are OK Result: Jun 28, Nokia Consumer Headset.

  EL SUPREMO ARTE DE ECHAR LAS CARTAS DR MOORNE PDF

Check the CCL 6. Start Up the BTS 1. Connection of the GPS antenna 1 1 Option: Click [ Close ]. See Figure 26 2. Tell us some more! Set the Position 1. See Figure 34 2. Alcatel BTS Case 7: It is important for both Abis links to be looped!

See figure 23 2.

Close the VSWR measurement window: Do not perform the whole procedure if the antennas are not available instalation loads are not already connected. The BTS is powered down. Close the BTS power panel 7.

Connect line for BTS Result: Click [ Stop ] 5. Leave the log book on site 3.

BTS commissioning Alcatel A9100, n some troubleshooting

Here’s a link to this great service Good luck! Switch OFF these breakers if not already done! Check the service lights are OK 3. BU41 2B if battery type BU41 was chosen. Check that commiasioning is allowed at the nominal frequency.

Connect the BTS to the 1. Hi everyone I am very new in the telecom field and so interested on BTS.

  ALPHABETUM DIABOLI PDF

BTS Installation and Commissioning – Intelcom Soluciones SAS

Electricity meter or options location 4: Check the antistatic wrist strap Check that the resistance of the antistatic wrist strap is greater then 1 M. Checking the RF cabling Option: Click [ Application part ] 5. Check that the service lights are OK.

For 3-phase system check: Connection of the GPS Antenna. A low residual AC voltage may be present between neutral and ground. Position of external alarms cables to be connected. The following message appears: See Figure 21 Supply for the Heat 2.